INFRASTRUCTURE
Centre for National Resilience
Project Overview
Location
Bullsbrook, WA
TYPE
Buildings | Roads | Services
SECTORs
Infrastructure

Scope of work
Monford’s scope of works on this project included the delivery the bulk earthworks, inground services, civil works and roads and concrete structures which includes:
- Site clearing, vegetation removal, grubbing including management and disposal of generated materials
- Construction of cut and fill exercise to prepare an earthwork platform
- Preparation of subgrades for access roads, internal roads, footpaths, earthwork platform for modular accommodation buildings and other service buildings
- Disposal of surplus and unsuitable materials and the trimming of batters, surface drains and formation
- Excavation of trenches and supply and install pipework, conduits, pits and electrical/hydraulic/fire services
- Concrete footings, pads, maintenance holes and shafts
- Civil works for carparks, roads and culverts including temporary works, inspection and testing, subgrade trim and detailed excavation, capping, pavements, crossovers, stormwater drainage, signage and line marking
- Formwork, concrete pumping, placement, reinforcement and finishing
Innovations and Challenges Overcome
There was a continuous flow of information and amendments between the client’s design team and our construction team, with updates occurring multiple times throughout the day and night due to the fast-paced nature of the build. We implemented a state-of-the-art document control system to ensure that all data was accurately captured and effectively communicated, minimising information loss. Our innovative approach was essential due to the rapid pace of the build, where construction often progressed ahead of the design. Additionally, with multiple contractors working on-site simultaneously, we effectively coordinated and interfaced with various teams to ensure seamless delivery.

Project Gallery